Merchandise Description
Product Description
Aluminum/C45 Timing Belt Pulley
Product Name | Aluminium Timing Pulley MXL XL L H XH XXH T2.5 T5 T10 AT5 AT10 S2M S3M S5M S8M GT2 GT3 GT5 3M 5M 8M Tooth timing Belt Pulley | |
Teeth profile | Trapezoidal toothed | MXL, XXL, XL, L, H, XH, XXH |
T-toothed | T2.5, T5, T10, T20 | |
Arc toothed | HTD3M, HTD5M, HTD8M, HTD14M, HTD20M, Gt2, Gt3, Gt5 | |
S-toothed | S2M, S3M, S4.5M, S5M, S8M, S14M | |
Parabolic-toothed | P2M, P3M, P5M, P8M, P14M | |
Y-toothed | G2M, G3M, G5M, Y8M | |
Teeth Quantity | 10-one hundred fifty enamel or customized | |
Inner Bore | 2-200mm H7 precision or personalized | |
Belt width | 4mm, 6mm, 9mm, 10mm, 12mm, 15mm, 20mm, 25mm, 30mm, 40mm, 50mm, 1/4”, 5/16”, 3/8”, 1/2”, 3/4”, 1”, 1.5”, 2”or custom-made | |
Content | carbon steel C45, Aluminum 6061, 6082 | |
Floor treatment | Anodize,Black Oxide,Phosphate, Galvanization, Nitriding, Dichromate |
Comprehensive Pictures
Timing pulley utilized on conveyor roller
Workshop
Equipments:
Lathe equipment, Hobbing equipment,Drilling machine,CNC device,Milling equipment, etc
FAQ
Q1: Are you investing organization or maker ?
A: We are manufacturing unit.
Q2: How prolonged is your supply time and shipment?
1.Sample Lead-times: 10-20 days.
2.Production Lead-occasions: thirty-45 days following buy confirmed.
Q3: What is your benefits?
1. The most aggressive price tag and good quality.
2. Ideal complex engineers give you the best assistance.
three. OEM is accessible.
TB 1610 tapered bushings can be employed in a variety of industrial applications. For fixing regular and non-standard V-belts, timing smoothing wheels, sprockets, TB hubs, couplings and other elements.
Put in 1.1. Clean all oil, dirt and paint from shafts, bushing holes, bushing exterior and holes of parts (sprockets, pulleys, and so forth.). Insert the bushing into the assembly. 3. Match the pattern of holes, not threaded holes (each hole is threaded on a single facet only). Insert the socket head cap screws or screws into the fifty percent-threaded holes proven in the image underneath. Put in the assembly on the shaft. 4. Transform the torque location or cover screw* to the suggested torque environment in the diagram under. Fill any unfilled holes with grease.